Testing
At APS, we have the equipment and manpower to load bank test generators up to 2.5 megawatts in size.
Trailer mounted equipment brought to your site for 2, 4 or 8 hours of load bank testing and generator set evaluations.
We also perform building load testing to determine generator reserve capacity vs. current usage.
- NFPA Testing
- Initial Commissioning Testing
- Annual Load Testing
- Diagnostic Load Testing
- Power Adjustments Performed
- Weekend Work Available
- Test Reports Provided