At APS, we have the equipment and manpower to load bank test generators up to 2.5 megawatts in size.

Trailer mounted equipment brought to your site for 2, 4 or 8 hours of load bank testing and generator set evaluations.

We also perform building load testing to determine generator reserve capacity vs. current usage.

  • NFPA Testing
  • Initial Commissioning Testing
  • Annual Load Testing
  • Diagnostic Load Testing
  • Power Adjustments Performed
  • Weekend Work Available
  • Test Reports Provided